Portfolio

Harvill’s Produce: Headquarters

H. J. High is currently serving as design-builder for Harvill’s Produce new Orlando headquarters. The project consists of the renovation of an existing 71,800 sf milk bottling facility and construction of a new 14,000 sf 34° cooler. H. J. High will … Continue reading

Continue Reading
  • Location
    Orlando, FL
  • Size
    85,800 SF

Bay Street Baptist Church: Sanctuary

H. J. High is currently serving as design-builder of Bay Street Baptist Church’s new Sanctuary in Eustis, Florida, with Architect Michael Brady, Inc. The project consists of a one-story approximately 8,500 sf pre-engineered metal building housing a 250-person multipurpose room, … Continue reading

Continue Reading
  • Location
    Eustis, FL
  • Size
    8,500 SF

Mitsubishi Power Systems Americas: Savannah Machinery Works Phase III

The joint venture of H. J. High Construction Company and Batson-Cook Company are currently working on the third phase of the Mitsubishi Power Systems Americas (MPSA) Savannah Machinery Works construction project. The team, which built the initial two phases of the facility, … Continue reading

Continue Reading
  • Location
    Pooler, GA
  • Size
    74,000 SF

The City of Port Orange: Wellfield Solar Energy Program

H. J. High served as Design/Builder on The City of Port Orange’s Wellfield Solar Energy Program located in Port Orange, Florida.  H. J. High worked with Tri-City Electrical Contractors to design and install the system. The project consisted of a 25 KW, 277/480 volt … Continue reading

Continue Reading
  • Location
    Port Orange, FL

Brevard Community College: Carver Administration Building Renovations

H. J. High served as Construction Manager for the renovations to Brevard Community College’s Cocoa Campus Carver Administration Building #2.  The main building received a total interior renovation including all new HVAC systems and ductwork, new lighting, ceilings, flooring, wall finishes, doors and hardware.  The … Continue reading

Continue Reading
  • Location
    Cocoa, FL
  • Size
    37,905 SF

Gulf Coast State College: Advanced Technology Center

The joint venture team of H. J. High and GAC Contractors are currently serving as Construction Manager for the new 80,000 sf Gulf Coast State College Advanced Technology Center (ATC). The ATC is designed to be a LEED Gold building and will be … Continue reading

Continue Reading
  • Location
    Panama City, FL
  • Size
    80,000 SF