The Tomahawk Cruise Missile Depot Facility includes a new 58,200 sf component assembly manufacturing facility with testing areas. Construction is a two-story steel frame with insulated metal panels. Extensive interfacing with the existing plant was required.
The Building 444 consists of a two-story 22,000 sf addition. The building is steel framed, tangible construction designed to receive a computerized robotic paint booth.
